Pre-designing

6 steps involved in Pre-designing

by Pre-design

Pre-designing

Pre-designing is a phase in architecture that involves outlining the goals and intentions of the client. The ultimate aim of this phase is to help decide the project parameters. This critical phase lays the foundation of what is to come in the other phases to follow. A mistake made at this stage can make or break the project. Especially if the architect is not fast enough to catch the error. Several Industrial architects and consultants offer a free consultation session to first-time clients. This meeting usually consists of the initial stage of pre-designing, whereby one can get a feel of the client expectations. This will make it easier to gauge if the firm is capable of meeting the challenges that lay ahead.

Here is a brief outline of the pre-designing phase from an architect’s viewpoint:

Consultation

This is the initial meeting between the client and the firm. The client puts forth their requirements and allows the firm to make their evaluations based on previous projects. With valuable inputs from the Industrial architects and consultants, the client is able to decide whether to pursue the project as it is or, in a modified manner. This meeting lays the foundation stone of the further steps to come. Once a relationship is established between the client and the firm, communication flow between them will be smoother.

Feasibility Studies

Once the client offers enough information about the project, the Industrial architects and consultants will be able to conduct studies related to the procurement of materials, an in-depth analysis of the project, and so on. Once the architect is satisfied with the information collected in the feasibility study, the remaining steps in the pre-designing phase are carried out.

Pre-designing

Site Selection & Analysis

In some cases, the client already has a site in mind, in which case the Industrial architects and consultants analyze the site to determine all the possibilities. Since the project needs to be sensitivity to the area it is located in, the architect looks at the site from every angle. However, if the client does not have a site in mind, the firm can help the client scout for locations that will be right for the project.

Code Analysis

Each project has to satisfy a variety of rules framed by the state laws as well as the local authorities. So, the architecture services ensure implementing the project. This usually involves zoning laws, earmarked construction sites and so on.

Master Planning

Architects collect all the required information from the projects and the site to create graphical documents. These documents will illustrate the evolution of the project. This, combined with a model of the proposed project, enhances the clarity of the project, leading to the client and the firm having a better visualization of each step.

Schedule Development

Once the site has been finalized, and the firm has given the green signal, it is time to create a schedule. This can help plan out the outline for the construction phase and give the client an idea as to what to expect in each phase and how long it will take as well. Once a schedule has been fixed, the costs can also be calculated. At the end of the day, this list of architectural services in the pre-designing phase can be made shorter. Project programmers will be doing this by writing a building program. They will be handing over the project to the architecture designing team.

The pre-designing done by the Industrial architects and consultants is a crucial stage of any construction project. Its effect can be seen in the magnificent structures that have been built all over the world.