Schematic Design What is a Schematic Design for industrial projects? Schematic design is the phase that follows conceptual design. It starts with rough drawings from the approved layouts in the conceptual phase of industrial infrastructure design. The main...
Site selection survey and its importance
Site selection survey & its importance Choosing a site can make or break a project. Therefore, selecting the right location is of prime importance. This becomes the best defence against costly mistakes. Engineering design consultants play a significant role while...
Value Engineering
What is Value Engineering? Value engineering is a function-oriented and organized team approach to fulfill the requirements of an industrial design project at the lowest cost possible. The target of this is to find alternative solutions, design optimization,...
Optimization and its importance in industrial infrastructure projects
What is optimization? Optimization is a word that is relevant to all factory design architects while designing any project. Merriam-Webster dictionary gives Optimization as an act, process, or methodology of making something (such as a design, system, or...
Is total design going to be the unique – global design standard for Industrial infrastructure design services?
What is Total Design? Working concurrently on multiple disciplines in a project is "Total Design". This is especially relevant in industrial infrastructure projects, where an integrated approach "total design" helps capture the entire requirements of a project in the...
Building design services and tackling of possible risk factors for them
Designing a building is never an easy task. Lots of time and effort is put into the detailed design process of a building. By the word design, many of us misinterpret it as just the way the building looks from outside. No! That is not the design of the building. That...
Building information modeling in integration with MEP layouts
MEP layouts Digitized By BIM Methods With advancing technologies, planning an industrial project is challenging work but never tiresome work for the industrial MEP consultants as it was before. Long back, all the designers were drafting plans and MEP layouts using...
6 steps involved in Pre-designing
Pre-designing Pre-designing is a phase in architecture that involves outlining the goals and intentions of the client. The ultimate aim of this phase is to help decide the project parameters. This critical phase lays the foundation of what is to come in the other...
MEP designs: The secret behind designing sustainable buildings
Firms that operate in the construction and architectural sector, are always on the lookout for innovative building designs. They want to make their structures become more environmentally friendly and sustainable. The intention behind this outlook is to reduce the...
Top reasons why structural designing improves strength and rigidity of buildings
Structural engineering is a critical part of civil engineering or any kind of construction. It is widely used in large-scale construction to ensure that the structure lasts for a long time to come. As a result, several Industrial structural design companies have...
8 ideas for construction companies to drive towards an eco green construction
It is no secret that the majority of the structural engineering firms in the world have resorted to innovative industrial infrastructure design and scientific methods to cut down on energy costs and conserve natural resources. As a result, Eco green construction is...
Building information technology in the construction industry
Building information technology has taken on the construction world by storm in recent years. Many feel that the Building Information Model is used only for 3D design. Nothing can be further from the truth! Building Information Model is an entire process that deals...
Electrical designing: The hidden link in industrial construction
The term industrial construction refers to a particular niche in the construction field. It deals with the designing, installation as well as maintenance of all kinds of mechanical and structural parts in factories, power plants, substations, etc. This is a very...
Building projects and soil testing goes hand in glove!
Major building projects, like high-rise buildings, cannot be kickstarted without a foundation inspection performed by qualified and experienced industrial architects. Skipping this step can only lead to severe repercussions, and your budget can go haywire. During the...
What industry insiders have to say about fire alarm
Remember the popular adage, there is no smoke without fire? Nowadays, this old saying can be taken in its literal sense! A casual mistake from the part of an employee or negligence is enough to reduce even the well-designed building to ashes. Therefore, all companies...