Industrial pre-design

Pre-engineered steel buildings (PEB) over a Conventional steel building

by Structural design

A pre-engineered steel building is preferred over a conventional steel building for industrial construction due to its fast construction. Both methods require the same essentials (design, foundation, framing, finishes) but have different processes. Let’s have a look into the comparison between Pre-Engineered steel buildings and Conventional steel Building structures, which shows the advantages of pre-engineered steel buildings (PEB) over Conventional steel buildings.

Pre-engineered steel buildings (PEB) over a Conventional steel building

Quick and affordable design.

Typically, PEB will have a faster and inexpensive design and build process. Almost all cases of your engineering, architectural design, and relevant sketches, drawings, and plans include in the price of your steel building. Steel building manufacturers have highly-specialized computer software programs and in-house designers who can quickly and efficiently tailor your building’s design to your needs. PEB is somewhat different from a conventional building, which is designed from scratch, with a sturdy design and detailing work required from an industrial structural design consultant. Conventional design methods usually take less time and more cost – often costing 30% more than PEBs.

PEB

Delivery speed

Once an industrial design consultant and client decide on PEB design, a steel building can arrive at the job site in about five to seven weeks. While Conventional steel building requires longer delivery times ranging from 20-26 weeks, causing weeks to months of delayed building time.

Smarter and more efficient design

Pre-engineered steel building (PEB) frames are highly-specific to the Industrial design project, without any material waste. Manufacturers use standard steel plates stocked in masse to construct this. The frame’s geometry more indicates the internal stress of the steel building, reducing the number of materials used. Whereas, manufacturers use mill-produced hot-rolled beams and columns to frame conventional metal buildings. They use it as they are less streamlined due to their all-purpose nature. Also, the extra materials may add extra cost and weight.

Simpler foundations

A lighter steel building requires a lighter foundation as same as a heavier steel building requires a heavier foundation. For the same reason, PEB will also mean a simpler and more basic foundation. But comparatively heavy foundation is required for Conventional steel building. 

Improved quality control

A steel building will be designed and fabricated in-house, with strict levels of quality control at every stage. People make Conventional steel buildings on-site. But this monitors and enforces less quality control. This affects the persistence and longevity of the steel building.

Conclusion :

Pre-engineered steel building construction isn’t ideal for all project types. However, if your project has the same design, pre-engineered buildings offer a lower cost, less waste, low maintenance, durability, flexible frames, and ease of expansion. Pre-engineered steel buildings (PEB) over a Conventional steel building is ideal for commercial and industrial design projects such as gas stations, self-storage facilities, and recreational facilities.

Categories

Archives

Pin It on Pinterest