Architects of industrial projects are a team of professionals. They guide clients through planning and designing with an eye on regulatory compliances and other statutory requirements for their projects. Moreover, industrial Architects ensure that the clients make...
Natural Lighting in factories
What is Lighting? Lighting or illumination uses natural or artificial light in spaces to get the desired aesthetic or functional effect. Architects for green factories use windows, skylights and other methods to optimise natural lighting. Additionally, well-planned...
Utility piping and process piping
Mechanical consultants for industrial projects use the words Utility piping and process piping very frequently. There is a difference between the two. However, both are a part of plant piping. Pipes carry liquids, gases, slurry, and fine particles. The piping system...
Why do consultants for industrial fire safety recommend gas suppression system in critical areas?
A gas suppression system is a fire safety system that suppresses fire with the help of gases. Consultants for industrial fire safety recommend a Gas suppression system for areas where water can damage the electronic equipment. So, this suppression system is used for...
What is the role of industrial architects & engineers in Virtual Completion of an industrial project?
Industrial projects, be it greenfield or brownfield, are challenging activities. Industrial architects & engineers use various terminology when mentioning project completion. Some of those terms include Partial Completion Substantial Completion Final Completion...
Why do industrial fire design consultants recommend fire alarm system in industries?
What is a fire alarm system? A fire alarm system is a device or a set of devices that sets off a visible or audible or visible and audible alarm in a fire incident. The industrial fire design consultants design the fire alarm system based on the project's...
Industrial Engineering design consultant and technical specifications
What is a technical specification? The technical specification is a detailed document that provides the project requirements. The industrial engineering design consultant issues them to the bidder along with the tender. Additionally, the engineering design consultant...
Why is good industrial lighting essential?
Lighting is of utmost importance in industries. Industrial electrical design consultants understand that good lighting is essential for the shop floor. As a result, workers can work safely and without fatigue. Why is good lighting needed in the industry? Good...
Fire Hydrants in industrial projects
What are fire hydrant systems? Fire hydrant systems are water-based fire fighting systems. The industrial Fire safety consultant relies on this water-filled piping network for fire risk management of the facility. The fire hydrant system is designed to work even if a...
Role of electrical engineering design consultants in industrial projects
What do electrical engineering design consultants do? Electrical engineering design consultants are a part of design consultants who design electrical installations. Also, they work with architects and other MEP consultants to provide an optimised design per the...
Role of industrial architects in pre-bid meetings
What are pre-bid meetings? The meetings called for after issuing the tenders to clarify the doubts of the bidder are called pre-bid meetings. The role of the industrial architect in a pre-bid meeting is very crucial. They respond to the bidder queries. These pre-bid...
Why drawing issue register is important for a factory design architect?
What is a drawing issue register? Drawings are a crucial link in the design process. It forms a part of the deliverables provided by factory design architects, engineers and consultants. The issue register is a process to record and track the drawings issued. Also,...
Role of architects and consultants in pre-qualification process of industrial projects
What is pre-qualification? Pre-qualification is assessing vendors/ contractors/ suppliers against predetermined criteria. In industrial projects, architects and consultants help clients to prequalify the vendors. Only those who prequalify participate in the tender....
Role of industrial Architects and Engineers in Built To Suit facilities
What are Built-to-Suit buildings (BTS)? These BTS buildings are customised according to the needs of the user. The developer constructs the building based on the developer's package provided by the architects and industrial design consultants of the prospective...
What is Project Kick-off Meeting?
What is a project kick-off meeting? Project kick-off is the initial meeting of the project with the client's team and the engineering design consultants' team. A similar kick-off meeting is also held after contractor finalisation and before mobilisation. Sometimes,...